The purpose of this final report is to discuss the four technical analyses that will be investigated on the A.I.T. Barracks. The technical analyses include one critical industry issue and three analyses overcoming constructability challenges. The analysis topics also follow the theme of schedule acceleration.

 

 

 Executive Summary

Advanced Individual Training

A.I.T. Barracks

Natalie Bockhorst

Construction Management

Fort Eustis, VA

User Note: While great efforts have been taken to provide accurate and complete information on the pages of CPEP, please be aware that the information contained herewith is considered a work‐in-progress for this thesis project. Modifications and changes related to the original building designs and construction methodologies for this senior thesis project are solely the interpretation of Natalie Bockhorst. Changes and discrepancies in no way imply that the original design contained errors or was flawed. Differing assumptions, code references, requirements, and methodologies have been incorporated into this thesis project; therefore, investigation results may vary from the original design.

This page was last updated on 4/4/2012 by Natalie Bockhorst and is hosted by the AE department ©2011

AE

Contact